LIST of perspective investment projects with FDIs by regions in Uzbekistan

2018-09-19

 

 

 

 

 

 

 

                                          mln. USD

Project name

Capacity

Realization period

Location

Foreign Partner / Investor

Total Cost

FDI

 

 

The Republic of Karakalpakistan –
6 projects

       

519

519

 

1.

Production of cement

800 thousand tons

2019-2021

Beruniy district

Evergreen Motors Group (South Korea)

300

300

 

2.

Production of cement

4,5 million tons

2019-2020

Karauzyak district

Hwanchon Plant Construction Co., Ltd (South Korea)

219

219

 

 

Andijan region – 2 projects

       

408

400

 

3.

Production of cement by introducing modern energy efficient technologies at Rush Milk LLC (JV Sing Lida LLC)

2,2 million tons

2019-2020

Khodjabad district

Anhui Conch (China)

208

200

 

4.

Establishment of a cotton-textile cluster, a hotel and a medical diagnostic centre

TBD

2019-2020

Djalakuduk district

Ajlan & Bros Group (Saudi Arabia)

200

200

 

 

Bukhara region – 7 projects

       

269

269

 

5.

Organization of a workshop for colouring various types of fabrics by industrial method

2,5 thousand tons

2020-2021

Bukhara city

RB Karesi Tekstil (Turkey)

60

60

 

6.

Construction of an energy-efficient solar power plant at FC Gris Energy Uzde LLC

43,8 MW

2020-2021

Karavulbazar district

Grace Group (Germany)

100

100

 

7.

Production of greenhouse constructions

100 hectares

2019-2020

Bukhara city

Aytekin Group,
Imes Group (Turkey)

15

15

 

8.

production of chipboard and fibreboard

250 pieces

2019-2020

Kagan district

Shandong Wade Wood Ltd (China)

30

30

 

9.

Creation of hotels and tourism resorts, production of alternative energy sources and electric vehicles

TBD

2019-2020

Bukhara city

Henan Suda Electric Vehicle Technology Co., Ltd (China)

64

64

 

 

Djizak region 13 projects

       

491,3

398,5

 

10.

Establishment of a textile complex (yarn, knitted fabric and ready-made garments) at LLC Sh. Rashidov Textile

3 thousand. tons

12 thousand linear metres 16,6 million pieces

2020-2022

Djizak city

Harstwood Textile Ltd (UK)

113,3

20,5

 

11.

Production of spare parts for cars (lights, seat belts, etc.) and external mobile batteries

TBD

2019

TBD

Tianjin Auto Parts Co., Ltd (China)

5

5

 

12.

Creation of an industrial park (construction of an industrial park and logistics centre)

TBD

2020-2021

Djizak city

Hebey Haowangjiao Wuliu Fazhan Youxian Gongsi (China)

100

100

 

13.

Production of aluminium cans

TBD

2020-2021

Djizak city

Beijing Naale Group Co., Lrd (China)

70

70

 

14.

Fruit and vegetable processing

TBD

2020-2021

Gallaorol district

Soboamie (UAE)

31

31

 

15.

Creation of the Central Asian Industrial Complex “Chanan”

TBD

2020-2021

Djiazak city

Da Miniggun (China)

82

82

 

16.

Manufacture of new types of composite boards

TBD

2020-2021

Pakhtakor district

Zonggrong Building Invest Co., Ltd (China)

5

5

 

17.

Construction of a plant for processing solid domestic waste

TBD

2019-2021

Djizak city

International Consortium NL

(Austria, Germany, Turkey, Canada, Australia)

70

70

 

18.

Production of sanitary ceramics

TBD

2019-2021

TBD

Entrepreneur A. Itkin (Austria)

15

15

 

 

Kashkadarya region 8 projects

       

225,9

225,7

 

19.

Organization of production of soft drinks CIDER at the enterprise Zistrai Cross Sider (1st Stage)

TBD

2019

Yakkabog district

Peter Stewart (UK)

4,7

4,5

 

20.

Construction of an underground tunnel

TBD

2019-2021

Kitob district

Chinese Investors

221,2

221,2

 

 

Navoi region – 11 projects

       

256

256

 

21.

Processing of vegetables and dried fruits packaging

TBD

2019-2020

Navoi city

Jampur Group (UAE)

30

30

 

22.

Production mineral fertilizers

TBD

2019-2020

Navoi city

Agrobest Group (Turkey)

30

30

 

23.

Creation of modern greenhouses

TBD

2020

Navoi city, Karmana and Kinomekh districts

Noor Group (UAE)

5

5

 

24.

Production of gold and silver products, creation of a training centre for jewellers, a museum, a hotel

TBD

2019-2020

Navoi and Zarafshan cities

Elrosa Case Business Solution (Greece)

5

5

 

25.

Production of cement

TBD

2020-2021

Zarafshan city

Schneider and Danzei (UAE)

150

150

 

26.

Establishment of a fruit processing plant (shock freezing, storage and drying)

TBD

2019-2020

Navoi city

MIRELITE MIRSA (Hungary)

5

5

 

27.

Production of mineral waste

TBD

2019-2020

Konimkh district

Base Metal International (China)

4

4

 

28.

Establishment of a fruit processing plant (drying)

TBD

2019-2020

Khatirchi district

Golden Leaf
(the Netherlands)

27

27

 

 

Namangan Region — 15 projects

       

225,0

223,7

 

29.

Creation of an agro-cluster for the development and cultivation of various seedlings at LLC Agro Pop

2,0 mln. pcs.

2019

Pap district

Private company Sadikov Nodir
(Russia)

24,0

24,0

 

30.

Organization of a recreation area on the territory of a small tourist zone "Nanai"

TBD

2019

Yangikurgan district

TBD

20,0

20,0

 

31.

Organization of production of terry products, bedspreads and socks at LLC "Ocean Towels Textile"

300 million pcs.

2019

NamanganCity

«Xingzhang Zaman Trading Co ltd» (China)

6,2

5,5

 

32.

Growing and processing of legumes and other agricultural products at Red Bean Agro LLC

3,3 thousand tons.

2019

Chartak district

 «Baktat» (Turkey)

5,6

5,2

 

33.

Organization of production of yarn, latex and nitrile gloves, socks at OOO Mega Textile

TBD

2019

Uychi district

 «Ortaosiyo textile АС» (Turkey)

10,5

10,5

 

34.

Biogas production

TBD

2018-2019

Chust district

 «ЕМС Invest SRL» (Russia)

30,0

30,0

 

35.

Organization of production of building materials at JV Marmaril LLC

12.0 thousand cubic meters

2018-2019

Chust district

 «Unit Paking» (Kazakhstan)

4,7

4,7

 

36.

Organization of a modern wellness center at Sherdor Grand LLC

TBD

2019

Yangikurgan district

 «Mubin Tour» (Turkey)

15,0

15,0

 

37.

Organization of electricity production based on renewable sources

50-100 MW

TBD

TBD

Turkey

100,0

100,0

 

 

Samarkand Region –

27 projects

 

 

 

 

256,2

190,4

 

38.

Organization of production of PVC profiles at OOO Gamma Window Systems

7 thousand pcs.

2019

Samarkandcity

TBD

4,5

3,1

 

39.

The organization of production of ceramic plates at OOO Prime Keramix

2.75 million square meters

2019

Samarkandcity

TBD

12,1

10,0

 

40.

Organization of production of burnt bricks at LLC JV Ceramic Bricks

1.5 million. pcs.

2019

Jambay district район

TBD

7,8

5,2

 

41.

Organization of production of fabrics (for military uniforms and uniforms)

TBD

2019-2020

Payarik district

 «Chalik Holding» (Turkey)

70,4

35,0

 

42.

Organization of production of veterinary chemicals at JV "Uzbiokombinat"

5 thousand pcs.

2019

Samarkandcity

 «Biveko» (Russia)

4,5

1,0

 

43.

Creation of a modern greenhouse, using the Korean technology

200 tn

2019

Payarik district

 «Shingvu 21 LTD» (South Korea)

85,0

85,0

 

44.

Organization of cement production at Marokand Cement Invest LLC

2,5 thousand tons.

2019-2020

Pastdargam district

 «Alashankou city shengtai trading Co Ltd » (China)

15,2

5,0

 

45.

Creation of a modern hotel complex "AfrosiyobPalace"

500 rooms

2019-2020

Samarkandcity

 «Registon КФТ» (Hungary)

15,0

15,0

 

46.

Creation of a super modern housing complex (entrepreneur A. Mukhamatkulov)

TBD

2020-2021

TBD

TBD

20,0

20,0

 

 

Syrdarya region — 5 projects

 

 

 

 

491,0

486,0

 

47.

The organization of the production of export-oriented chemical products (caustic soda, alumina, calcium oxide and aluminum oxide) at OOO Patex Trade Consult, JSC Uzkimyosanoat (1st stage)

35 thousand tons.

20 thousand tons.

20 thousand tons.

10 thousand tons.

2019-2020

Yangier city

 «Zongtian Intrnational» (China)

68,0

68,0

 

48.

The organization of the production of export-oriented chemical products (caustic soda, alumina, calcium oxide and aluminum oxide) at OOO Patex Trade Consult, JSC Uzkimyosanoat (2-nd stage)

8 thousand tons. hydrazine,

25 thousand tons of caustic soda,

15 thousand tons. АDS

2020 — 2022

Yangier city

 «Zongtian Intrnational» (China)

102,0

102,0

 

49.

1) Manufacture of shoes, glasses,

accessory for clothes

2) Plant processing by industrial method

3) Food production

4) Production of cast batteries

TBD

2019 — 2022

Bayavut district

«NGG Engineering Bojovut Ltd (South Korea)

250,0

250,0

 

50.

Organization of production of corn processing (production of glucose, fructose, corn oil) at LLC BKK Besler Crystal Kuwat

8 thousand hectares

2019-2020

TBD

 «Beshlar» (Turkey)

70,0

65,0

 

 

Surkhandarya region — 3 projetcs

 

 

 

 

736,0

736,0

 

51.

Construction of a wind turbine power station

600 mW.

2018 — 2020

Baysun district

"Etka Ko Energy Vsetka Ko Engineering" (Turkey)

500,0

500,0

 

52.

Organization of cement production

300 thousand tons.

2019-2020

Sherabad district

«Natural Cement Group» (South Korea)

16,0

16,0

 

53.

Organization of electricity production based on photovoltaic solar panels

300 mW.

2018 — 2020

Sherabad district

LLC "Shefra Energy Limited" (Great Britain)

220,0

220,0

 

 

Tashkent region - 15 projects

 

 

 

 

480,3

476,5

 

54.

Organization of production of gas-concrete blocks at the foreign company of Chang Cheng Build LLC

400 thousand m3

2019 y.

Angren city

Entrepreneur
Liu Shengjiang (China)

6,8

6,8

 

55.

Organizing a greenhouse farm for the cultivation of vegetables, production and processing of meat at LLC “King Road agro animal”

1 thousand tones

2021 y.

Quyichirchik district

Company «Renadauyang» (China)

50,0

50,0

 

56.

Organizing production of cement at the state enterprise "Khin Li"

1 million tones

2019 y.

Ahangaran district

Company «Anhuykonch cement» (China)

108,0

108,0

 

57.

Organizing production of plastic pipes and industrial and household purposes

To be decided

To be decided

To be decided

Company «Mannessman АG» (Turkey)

200,0

200,0

 

58.

Expansion of production of reinforced concrete products

To be decided

To be decided

To be decided

«Saffir qurilish montaj» Co., Ltd.

11,5

11,5

 

59.

Organizing production of concrete products and hyperpressed bricks

To be decided

To be decided

To be decided

Company «Alians Capital» (Turkey)

4,0

4,0

 

60.

Organizing cluster for rabbit breeding

To be decided

To be decided

To be decided

Company «Ningbolvxing agricultural technology Co., Ltd.»

30,0

30,0

 

61.

Organizing production of tobacco products

To be decided

To be decided

To be decided

Company «Gulbakhar tobacco international Co., Ltd.» (UAE)

30,0

30,0

 

62.

Organizing production of tobacco products (Marlboro)

To be decided

To be decided

To be decided

Company «Philip Morris International» (Japan)

30,0

30,0

 

 

Fergana region — 12 projects

 

 

 

 

160,5

160,5

 

63.

Establishment of a poultry farm and a meat processing complex at Bogdod Sokhili LLC

5,2 thousand tones

2019 y.

Baghdad district

Company «VGRUP» (Israel)

8,5

8,5

 

64.

Organizing processing of sulfur

To be decided

2019 y.

Quvasay city

Company «Great Wall ceramics » (China)

8,0

8,0

 

65.

Organizing production of molded products

To be decided

2019 y.

Quvasay city

Company «Great Wall ceramics» (China)

7,0

7,0

 

66.

Organizing production of glass products

To be decided

2019 y.

Quvasay city

Company «Great Wall ceramics» (China)

7,0

7,0

 

67.

Organizing production of refractory bricks

To be decided

2019 y.

Quvasay city

Company «Great Wall ceramics» (China)

9,0

9,0

 

68.

Expansion and modernization of existing capacity

250 thousand tones

2018 — 2021 yy.

Kokand city

Company «Indorama Holding B.V.» (Netherlands)

15,0

15,0

 

69.

Organizing production of drywall

To be decided

2019 y.

Uzbekistan district

Company «Knauf» (Germany)

5,0

5,0

 

70.

Organizing production of high-quality motor oils

To be decided

2019 y.

Uchkuprik district

Company «Hyosang Innotech» (South Korea)

5,0

5,0

 

71.

Organizing production of melamine at JV LLC Indarama Fergana Chemicals

40 thousand tones

2018 — 2021 yy.

Fergana city

Company «Indorama Holding B.V.» (Netherlands)

87,5

87,5

 

 

Khorezm region — 10 projects

 

 

 

 

76,3

58,1

 

72.

Creation of hotel services

100 rooms

To be decided

Khiva city

Company «Murad Nadir A.S.» (Turkey)

6,0

6,0

 

73.

Organizing a tourist complex along the “Govouk Cul”

To be decided

To be decided

Khiva district

Company «Sifal» (France)

25,0

25,0

 

74.

Organizing the production of cement

300 thousand tones

To be decided

Khazarasp district

China

31,5

15,8

 

75.

Creation of a hotel complex in the historical part of “Ichan kala”

70 rooms

To be decided

Khiva district

Company «Artmer» (Turkey)

6,0

6,0

 

 

Tashkent city — 53 projects

 

 

 

 

779,5

766,0

 

76.

Creation of a hotel service at Zubayirbek Otabek Khozhi LLC

To be decided

To be decided

Almazar district

ООО «Designer 95» (Rusia)

6,0

6,0

 

77.

Organizing production of textiles

To be decided

To be decided

Almazar district

ООО «Demir ugli textile » (Turkey)

6,0

6,0

 

78.

Construction of commercial houses at JV Wonder House LLC

To be decided

To be decided

Mirabad district

Company “Puzhang Yu Hui Jia Investment Investment Manege” Co. Ltd. (China)

5,0

5,0

 

79.

Organizing extraction and processing of mountain stones (travertine) at JV Marmar-Real LLC

To be decided

To be decided

Mirabad district

Company «To stima» (Kazakhstan)

10,5

4,9

 

80.

Creation of a multifunctional residential complex at ZhNS Lab LLC

To be decided

To be decided

Sergeli district

«Хил Пяунг» Ко. ЛТД (South Korea)

7,0

7,0

 

81.

Organizing production of jewelry

To be decided

To be decided

Chilanzar district

South Korea

15,0

15,0

 

82.

Creation of a medical center and a hotel (Arvand Tashkent Story enterprise)

To be decided

To be decided

Yunusabad district

Iran

10,0

10,0

 

83.

Establishment of a plant for the processing of domestic waste (Enterprise Export)

To be decided

To be decided

Yunusabad district

Czech Republic

14,0

14,0

 

84.

Creation of a modern hotel (“Saray Plastic” enterprise)

To be decided

To be decided

Yunusabad district

China

6,0

6,0

 

85.

Creation of a modern training center (Sher-az-techno enterprise)

To be decided

To be decided

Yunusabad district

China

5,0

5,0

 

86.

Reconstruction of the Radisson Blue Hotel (Yasel-Invest)

To be decided

To be decided

Yunusabad district

Turkey

50,0

50,0

 

87.

Realization of the project “Turkish Business Center”

To be decided

To be decided

Yunusabad district

«Celik energy» (Turkey)

400,0

400,0

 

88.

Creation of a modern business center

To be decided

To be decided

Yunusabad district

«Ziraat bank» (Turkey)

10,0

10,0

 

89.

Creation of a multifunctional residential complex and a 4-star hotel (Terra)

180 rooms

To be decided

Yunusabad district

Turkey

10,0

10,0

 

90.

Creation of the Miracle Garden complex (enterprise “House Bulding”)

To be decided

To be decided

Yunusabad district

Turkey

6,0

6,0

 

91.

Organizing production of household appliances (Nair company)

To be decided

To be decided

Yunusabad district

China

139,0

139,0

 

92.

Organizing the production of large cranes (JV Cran Expert Production LLC)

To be decided

To be decided

Yashnabad district

Company «AR Industrial GMBECH» (Austria)

8,5

2,3

 

93.

Organizing the production of jewelry products based on local raw materials (based on public-private partnerships)

10 tones

To be decided

To be decided

Companies «Imperial Jewelry Inc.», «Olef Creations Inc.» and «Richline Group (USA)

25,0

25,0

 

94.

Creation of an additional medical building and a hospital on the basis of public-private partnership

object

To be decided

To be decided

JV “Vitamed Medikal” Ltd.

16,0

16,0

 

95.

Organizing catering services for preschool education on the basis of public-private partnership

To be decided

To be decided

To be decided

The group of companies "PRO" (Russia)

10,0

10,0

 

96.

Construction of egg factories

To be decided

To be decided

To be decided

Company «Damizlik Isletmeleri Sanayi Ticaret Inc.Co. Ltd.» (Turkey)

150,0

150,0

 

                             

 

 

Home | Contact us | Site Map | Hotline of the MFA of the RU: (+998 71) 233-28-28
Copyright © 1999-2018 Consulate General of the Republic of Uzbekistan in Bangkok